COLLINSVILLE SOLAR FARM

Compliance

Following the Construction Phase RATCH-Australia must provide and maintain at all times the existing sealed access from Powerhouse Road to the Powerhouse site and onsite parking area to a reasonable standard.

RATCH-Australia must provide and maintain at all times the existing 38 sealed car parking area at the Powerhouse Site for use by employees and visitors to the site.

Discharges of water pollutants, wastewater or stormwater from the site must not cause measurable levels of water pollutants in the receiving waters to fall outside the acceptable ranges specified in the ‘Australian Water Quality Guidelines for Fresh and Marine Waters’, ANZECC 2000. This will be monitored throughout the lifespan of the project. 

RATCH-Australia must ensure that when undertaking any on-site or external works, including any filling and extraction, appropriate dust control measures are implemented in accordance with the Environmental Protection Act 1994 and complies with the relevant air quality objectives defined in the Environmental Protection (Air) Policy 2008. This will be monitored throughout any on-site or external works.